Campus wireless that survives a full lecture hall
1,900 access points across 34 buildings, designed for realistic occupancy and delivered inside a single summer vacation.
1,900
Access points
Education
Frameworks we deliver against
The pressures
Our response
Delivery planned to summer and half-term windows with contingency built into the schedule, not hoped for.
Surveys modelled on realistic occupancy so a full lecture hall stays usable.
Enhanced DBS checks for all personnel working on sites with students present.
Services
Infrastructure
Design, installation and certification of structured cabling, comms rooms and campus networks — delivered to standard, on a plan.
Operations
Multi-site hardware and software rollout programmes run to a fixed schedule with per-site sign-off and consolidated reporting.
Operations
Device lifecycle, imaging, application packaging and deskside support that makes the everyday experience unremarkable.
Evidence
1,900 access points across 34 buildings, designed for realistic occupancy and delivered inside a single summer vacation.
1,900
Access points
Compliance
Other sectors
Regulated infrastructure, evidenced change control and support windows that respect market hours.
Field engineering at national scale — exchange, edge and customer premises, on the same SLA.
Clinical-safe change, patient data protection and infrastructure that cannot be taken offline casually.
Education
The sooner we understand your change windows, clearance requirements and freeze calendar, the more accurate the plan will be — and the fewer surprises land in month three.