940-site EPoS and network refresh across eleven countries
Replacing end-of-life point-of-sale and branch networking across 940 stores in fourteen months, without closing a single store for a day.
940
Sites completed
Case studies
Selected work
Replacing end-of-life point-of-sale and branch networking across 940 stores in fourteen months, without closing a single store for a day.
940
Sites completed
A workload-by-workload disposition assessment that stopped two of three planned migrations and cut projected three-year run cost by 31%.
31%
Three-year cost reduction
Structured cabling and core network replacement across four clinical buildings, delivered in 90-minute windows agreed ward by ward.
0
Clinical incidents
Resident engineers, zero-touch device provisioning and ISO 27001 readiness delivered in parallel with a four-market expansion.
4
Markets covered
Consolidating two owned facilities into colocation with certified destruction of 1,400 assets and no missed dispatch window.
3h 40m
Longest outage
1,900 access points across 34 buildings, designed for realistic occupancy and delivered inside a single summer vacation.
1,900
Access points
Track record
13+
Years in operation
Independent since 2013
97
Countries covered
With active engineer coverage
4,500+
Engineers on call
Vetted and accredited
1,200+
Sites deployed
In the last three years