Exiting two data centres in a single weekend each

Consolidating two owned facilities into colocation with certified destruction of 1,400 assets and no missed dispatch window.

Engagement

Client
A Netherlands logistics operator
Sector
Manufacturing & Logistics
Location
Netherlands and Germany
Completed

Results

What changed

  • 3h 40m

    Longest outage

    Against a four-hour ceiling

  • 1,400

    Assets certified

    Serial-level destruction records

  • £186k

    Value recovered

    Returned from remarketing

  • 99.2%

    Diverted from landfill

    WEEE-compliant processing

The challenge

What we were working against

The client was exiting two ageing owned facilities into colocation, on a lease deadline that could not move. Dependency documentation was six years stale, and the warehouse management system driving every dispatch could not be offline for more than four hours at any point.

The approach

What we actually did

In sequence, including the parts that happened long before anyone touched hardware.
  1. 01

    Rebuilt the dependency map from live network telemetry rather than the outdated documentation, over an eight-week discovery period.

  2. 02

    Sequenced workloads into move groups so the warehouse management system and its dependencies moved together in a single four-hour window.

  3. 03

    Pre-built and pre-cabled the target racks in colocation, so the move weekend was a physical relocation rather than a build.

  4. 04

    Rehearsed the cutover twice against a rollback plan with explicit abort criteria and a decision owner named in advance.

  5. 05

    Decommissioned, sanitised and certified 1,400 retired assets under chain of custody, returning £186k in residual value.

Their P1 response has never once been late in three years, and when they missed a P3 target last spring the credit appeared on the invoice before we noticed. That is what accountability looks like.
Jan MeijerDirector of IT, a Netherlands logistics operator

Services used

What this programme drew on

  • Infrastructure

    Data Centre Support Services

    Rack and stack, migrations, decommissioning and resident data centre engineering across colocation and on-premises facilities.

  • Operations

    IT Asset Management & Disposition

    Asset tracking through life and certified, auditable disposal at end of life — GDPR, WEEE and NIST 800-88 compliant.

More work

Other programmes

Client identity is withheld under the confidentiality terms of the engagement. Figures are as reported at programme close and can be substantiated under NDA on request.