Skip to main content
White RavenIT Consultant Ltd

Thousands of sites, one plan

IT Rollouts & Deployment Programmes

A rollout is a logistics problem wearing an IT costume. Success comes from staging, scheduling and site readiness — not from engineering heroics on the night. We run rollouts from a central programme office with per-site readiness gates, so you know which of your 900 branches will slip before the week it slips.

Typical outcomes

  • 1,200+

    Sites deployed in the last 3 years

  • 98.6%

    First-time-right installations

  • 40+

    Countries in a single programme

Capabilities

What this service actually covers

Scoped areas, not marketing categories. Each one is something we can be held to in a statement of work.
  • Programme management office

    Central PMO with site readiness tracking, weekly reporting and a single escalation route for the whole programme.

  • Staging & configuration

    Devices imaged, configured, asset-tagged and pre-tested in our facilities before they ever reach a site.

  • Logistics & last-mile delivery

    Scheduled delivery to the exact loading bay, floor or desk, with packaging removal and waste take-back.

  • Site installation & sign-off

    Installation, user handover and a signed completion report per site, uploaded within 24 hours.

Deliverables

What you receive

Contractual outputs, not best-endeavours extras. If it is on this list it is in the statement of work.
  • Site survey and readiness matrix
  • Build standard and gold image sign-off
  • Weekly programme dashboard and burn-down
  • Per-site completion certificate
  • Asset register reconciled to your CMDB
  • Snag list with committed closure dates

Talk to someone who does this

No qualification call with a salesperson first — you speak to a consultant from the practice that would deliver the work.

Opens a pre-filled draft in your email client. No data leaves this page.

Where it applies

Sectors that use this most

The constraints differ by sector even when the technology does not. These pages set out what changes.
  • Retail & E-Commerce

    Store estates, EPoS and distribution centres kept trading — including through peak.

  • Education

    Campus networks, device programmes and safeguarding-aware support delivered inside term-time constraints.

  • Government & Public Sector

    Cleared engineers, framework-compliant procurement and evidence trails built for public scrutiny.

Proof

This service in delivery

Questions

The things buyers actually ask

Including the awkward ones. If you have a question that is not here, ask it directly — we answer in the same register.
What is the largest rollout you have delivered?

A 940-site retail EPoS and network refresh across eleven countries, completed in fourteen months at a run rate of roughly eighteen sites a week.

Who owns the risk if a site is not ready?

Readiness is tracked jointly, but the PMO owns chasing it. Abortive visit charges only apply where a site was signed off as ready and turned out not to be — and that report goes to both sides.

Can you dispose of the equipment being replaced?

Yes, through our ITAD service. Old kit goes back on the same vehicle, which is usually the cheapest and greenest way to run a refresh.

Related services

  • Consulting

    IT Consulting & Advisory

    Independent technology strategy, architecture reviews and roadmaps that tie every pound of IT spend to a business outcome.

  • Operations

    Managed IT Services

    Fully managed monitoring, service desk and infrastructure operations under a contractual SLA, 24 hours a day.

  • People

    Global Smart Hands & Field Engineering

    Vetted, certified engineers dispatched to any site in 90+ countries — from a four-hour emergency call-out to a permanent resident engineer.

IT Rollouts

Ready to scope it rollouts?

Send us the shape of the problem — sites, timescales, what has already been tried. We will come back with an approach and an honest view of whether we are the right supplier.