Exiting two data centres in a single weekend each
Consolidating two owned facilities into colocation with certified destruction of 1,400 assets and no missed dispatch window.
3h 40m
Longest outage
Manufacturing & Logistics
Frameworks we deliver against
The pressures
Our response
Purdue-model-aligned segmentation that protects the plant floor without breaking control traffic.
Ruggedised switching, enclosures and cabling specified for temperature, dust and vibration.
Work packaged into planned shutdowns with rehearsed sequencing and hard abort criteria.
Services
Infrastructure
Design, installation and certification of structured cabling, comms rooms and campus networks — delivered to standard, on a plan.
Infrastructure
Firewall, SD-WAN, zero-trust and endpoint security design and operation, mapped to the framework your auditors actually use.
People
Vetted, certified engineers dispatched to any site in 90+ countries — from a four-hour emergency call-out to a permanent resident engineer.
Evidence
Consolidating two owned facilities into colocation with certified destruction of 1,400 assets and no missed dispatch window.
3h 40m
Longest outage
Their P1 response has never once been late in three years, and when they missed a P3 target last spring the credit appeared on the invoice before we noticed. That is what accountability looks like.
Compliance
Other sectors
Regulated infrastructure, evidenced change control and support windows that respect market hours.
Field engineering at national scale — exchange, edge and customer premises, on the same SLA.
Clinical-safe change, patient data protection and infrastructure that cannot be taken offline casually.
Manufacturing & Logistics
The sooner we understand your change windows, clearance requirements and freeze calendar, the more accurate the plan will be — and the fewer surprises land in month three.