940-site EPoS and network refresh across eleven countries
Replacing end-of-life point-of-sale and branch networking across 940 stores in fourteen months, without closing a single store for a day.
940
Sites completed
Technology & SaaS
Engagement
Results
4
Markets covered
Within two weeks each
20 min
New hire to productive
Anywhere in the world
9 mo
To ISO 27001 certification
First-time pass
£4.4m
Enterprise pipeline unblocked
Previously stalled on security review
The challenge
The client was opening in four markets in nine months while simultaneously trying to close enterprise deals that were blocked on a security questionnaire they could not answer. Corporate IT had been deliberately deprioritised in favour of product engineering, leaving device management on a spreadsheet and no formal control framework at all.
The approach
Placed a resident engineer in each new market within two weeks of the decision, covering the gap until local hiring completed.
Rebuilt device management on Intune and Jamf with zero-touch enrolment, shipping configured devices directly to new hires.
Ran ISO 27001 implementation as a project with a fixed certification date, collecting evidence continuously rather than retrospectively.
Implemented starter-mover-leaver automation driven by the HR system so access provisioning stopped being a manual ticket.
Transitioned each market to locally hired staff on an agreed handover schedule with runbooks and shadowing.
We needed a Singapore presence before we had a Singapore entity. They had an engineer on site within a week and covered us for eight months until we hired locally.
Services used
People
Certified engineers, project managers and specialists embedded in your team on flexible commercial terms.
Operations
Device lifecycle, imaging, application packaging and deskside support that makes the everyday experience unremarkable.
Infrastructure
Firewall, SD-WAN, zero-trust and endpoint security design and operation, mapped to the framework your auditors actually use.
More work
Replacing end-of-life point-of-sale and branch networking across 940 stores in fourteen months, without closing a single store for a day.
940
Sites completed
A workload-by-workload disposition assessment that stopped two of three planned migrations and cut projected three-year run cost by 31%.
31%
Three-year cost reduction
Client identity is withheld under the confidentiality terms of the engagement. Figures are as reported at programme close and can be substantiated under NDA on request.
Similar problem
If the shape of your programme looks like this one, we have almost certainly hit the failure modes already. Let us save you the discovery.